Dynamic Fabrication was contracted to perform detailing and fabrication on the above coal handling facility. DFI fabricated the truck
dump, screen tower, transfer hopper and the refuse bin. They had the responsibility of the structures for each as well.
Screening &
Crushing Tower
Raw Coal Transfer Hopper
Erected Refuse
Bin
Limestone and Gypsum handling belt feeders with associated chutework ready for shipment to West Virginia.
Upper and lower discharge chutes off of twin 10'X20' clean
coal screens
Discharge chutes and underpans ready for shipment to Colorado.
The chutes have already been lined with ceramic tile and the
underpans have been lined with a trowelable liner in our shop.
Dynamic Fabrication Inc. 3523 US HWY 62E, Beaver Dam, KY 42320
Ph. 270-274-5810 Cell. 270-302-1068 or 270-832-8509
Toll Free 1-888-274-5818
Armstrong Coal 1200 TPH Preparation Facility
Warrior Coal 1200 TPH Preparation Facility
Classifying Cyclone Stand ACC Midway Plant
Below, DFI fabricated the chutes and hoppers inside the breaker building and surge bin. Inside the Prep Plant itself
DFI fabricated 90% if the chutes and material handling eqipment. DFI's sister company fabricated the structural steel
for the Breaker building and the truss sections and hog trusses for the material handling portion of the plant layout
from Breaker to Gob bin to Clean Coal Silo.